Planner · Screen 06

Planning groups

Planning area controls, effective dated and separate from finite rows

1. Group definition · 020 PDK / Woven sewing

2. Group flow and ownership

3. Eligible operation overrides

OperationStateCalendarCapacity factorMaterial location
300 PartsewEnabledPDK two-shift0.94PDK WIP store
400 Sew ELCEnabledPDK two-shift1.00PDK WIP store
800 Postsew ELCEnabledPDK two-shift0.88Postsew WIP

Print is deliberately absent: it reserves a shared facility pool rather than a Sewing-group capacity.

4. Safeguard

  • Only section-relevant operations can be enabled.
  • Changes create dated revisions and preview affected drafts.
  • Published strips retain their original group context.